Try to move the pulley from left to right.
Mayline parallel bar installation instructions.
Remember to read all the instructions before beginning the installation or you may miss the opportunity to install the metal clips which stop your bar for moving side side or worse you could damage the bar.
Up and down arrows will open main level menus and toggle through sub tier links.
66 and 72 rectangular desk assembly instructions ard7230 ard6630 ard6030.
Alvin paral liner 1101 48 mobile parallel straightedge 48 inches.
Even in today s world of electronics many design professionals are still using parallel straightedges to draw a line that is square drafting triangles or helping with quick sketches before reproducing your ideas electronically.
The wire used to move the parallel bar up and down is mounted on a series of pulleys which are in turn mounted to the drafting board with screws.
E z grip cap the e z grip cap is a handy 5 16 raised gripping bar that allows for easy maneuverability.
The drafting bar literally floats across the drawing surface and come with all mounting hardware.
2 9 out of 5 stars 4.
Parallel with worksurface edge.
The site navigation utilizes arrow enter escape and space bar key commands.
Place each pulley between your thumb and index finger.
Ball bearing rollers built into durable black phenolic plastic base.
Only 1 left in stock order soon.
Mayline parallel straightedge options explained.
Left and right arrows move across top level links and expand close menus in sub levels.
Instructions to convert above board parallel rule to under board attachment when ordering components specific color and or size information may be required.
Be sure that the cable passes between cable clamp and l h.
Drill 3 32 pilot holes at marked locations.
Align cable parallel with edge of board as shown in fig.
Examine the pulley mounts.
Free shipping by amazon.
Secure corner plates using four 6 x 1 2 screws d.
This parallel bar moves seemlessly across the drawing surface has resulted in little to no smudging and in conjuction with a proper set.
Attach cable ends with terminals to spring.
Transparent blade for see through registration and fine line drawing quality.
Contact a mayline customer service representative.
Ball bearing rollers available in metal recommended for vellum bond and delrin for drafting film.
Parallel straightedge replacement parts can be found here.
1 16 of 101 results for mayline parallel bar price and other details may vary based on size and color.
These products are also called mayline parallel straightedges parallel drafting bars parallel bars and parallel straightedges.
Be sure cable passes between clamp and corner plate.
Install cable clamp e onto stud of left corner plate c.
Get it as soon as wed sep 9.
Over time the screws become loose causing the wire to become slack.