In most cases siding clearance should be about 6 8 from the ground.
Minimum distance between siding and grade.
Foundations are typically required to extend above the adjacent finished grade a minimum of 6 in.
Clearances greater than 6 in.
Thicker material allows for deeper cut aesthetic designs.
Or as required by local building codes.
Fiber cement lap siding having a maximum width of 12 inches 305 mm shall comply with the requirements of astm c1186 type a minimum grade ii or iso 8336 category a minimum class 2.
Siding materials need proper clearances between finish grade and the siding regardless the type of siding.
Top of the line siding.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
May be required in accordance with local building codes.
A concrete walkway runs around my house front to side to backyard.
Ry foundation walls shall extend above the finished grade adjacent to the foundation at all points a minimum of 4 inches 102 mm wheremasonry veneer is used and a minimum of 6 inches 152 mm elsewhere.
Having your siding too close to the ground is just asking for trouble.
This requirement is not just to prevent damage to the siding it serves a couple of other functions as well.
There s about 3 dirt bed with plants between the walkway and the house.
If it s done improperly the siding may be too close to the ground which will invite insects pests and other types of damage.
0 055 the pros of thicker siding 1.
In this article we re going to explain the minimum distance between siding and grade for each type of material.
The slope of the finished grade must be maintained at a minimum of 6 inches of fall within 10 feet.
The minimum distance above adjacent grade to which the foundation must be extended provides termite.
Minimum distance between siding and grade.
James hardie products must be installed with a minimum of 6 in.
The closer to the grade the sooner your siding will deteriorate.
The concrete and the dirt bed slowly rise a few inches from the front of the house to the back of the house.
Clearance to the ground on the exterior of the building.